West End Roof Repair (909) 689-8243

Tile Roof Repair and Re-Lay

Concrete tile lasts 50 years or more. The paper under it lasts about 20 to 30 in our heat. When a tile roof leaks, the tile is usually fine and the paper is not.

  • Broken and slipped tile replaced
  • Ridge and hip tiles reset
  • Full or partial re-lay with new underlayment
  • Your tile reused where it is sound
Call (909) 689-8243
Tile Roof Repair & Re-Lay

What a re-lay is

The crew lifts the tile and stacks it on the roof, tears off the old paper, fixes any soft wood, puts down new underlayment and new flashing, and then sets your tile back. Broken pieces get replaced with matching tile.

Because the tile is reused, a re-lay usually costs less than a new tile roof and the house looks the same when it is done.

Tile Roof Repair & Re-Lay

Partial re-lays

Sometimes only one slope, a valley or the area around a skylight has failed. A partial re-lay fixes that section. Your estimate will say whether a partial makes sense or whether the rest of the paper is close behind.

Do not walk on it

Concrete and clay tile break under a boot if you step in the wrong place. If you need to see the roof, look from a ladder at the edge or from the street, or let us send photos.

Want someone to look at it?

Call Us